Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/conan-20240903/conan/wp-includes/functions.php on line 6114
projek pembangunan | Scoop

projek pembangunan

Percepat projek kemudahan rakyat Sabah, Anwar tidak mahu lagi ada alasan

Perdana Menteri Datuk Seri Anwar Ibrahim menggesa supaya pembangunan kemudahan rakyat Sabah termasuk bekalan air, elektrik dan Lebuh Raya Pan Borneo dipercepatkan, tanpa ada sebarang alasan lagi.

PM arah projek pembangunan semula Kg Sg Baru tidak ditangguhkan lagi, kata Johari

Beliau mendakwa pihaknya telah dimaklumkan mengenai perkara terbabit menerusi Pejabat Perdana Menteri (PMO), pada bulan lalu

Henti amalan minta, beri komisen dalam projek pembangunan: PM

Perdana Menteri Datuk Seri Anwar Ibrahim mahu amalan meminta dan memberi komisen dalam mana-mana pelaksanaan projek pembangunan termasuk projek perumahan dihentikan segera

Popular