Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/conan-20240903/conan/wp-includes/functions.php on line 6114
power cut | Scoop

power cut

Johor MB fumes over ‘embarrassing’ power outage at Johor Bahru checkpoint

A power outage lasting more than 12 hours at the Johor Bahru border checkpoint has left Menteri Besar Datuk Onn Hafiz Ghazi fuming, calling the incident an embarrassment to the state.

Popular