Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/conan-20240903/conan/wp-includes/functions.php on line 6114
Loji Rawatan Kumbahan Serantau | Scoop

Loji Rawatan Kumbahan Serantau

‘Putrajaya sediakan peruntukan besar, pastikan penyediaan infrastruktur pembetungan moden dan efisien’

Kementerian Sumber Asli, Alam Sekitar dan Perubahan Iklim (NRECC) menetapkan sasaran 95 peratus perkhidmatan Loji Rawatan Kumbahan Serantau (RSTP) di bandar-bandar utama di negara ini menjelang 2030

Popular