Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/conan-20240903/conan/wp-includes/functions.php on line 6114
IWK | Scoop

IWK

Bajet 2025: Kejadian tanah mendap ‘buka mata’ keperluan untuk tambah baik aspek infrastruktur

Kejadian tanah jerlus di ibu kota baru-baru ini menunjukkan sistem infrastruktur perlu ditambahbaik dan menjadi keperluan yang perlu diberikan perhatian pada pembentangan bajet 2025

Kawasan selamat dikunjungi cuma tak semeriah dahulu: Peniaga Jalan TAR

Menurut Persatuan Penjaja Jalan TAR, orang awam masih meragui status keselamatan di kawasan sekitar insiden tanah runtuh itu memandangkan tiada kenyataan rasmi dari DBKL setakat ini

Search for sinkhole victim still at Pantai Dalam sewage plant, team clearing blocked manhole path

A total of six manholes within Jalan Masjid India-Pantai Dalam sewage plant area were opened in stages

Tanah runtuh: IWK ambil langkah mitigasi di loji rawatan kumbahan

Indah Water Konsortium (IWK) Sdn Bhd telah mengambil langkah mitigasi segera di Loji Rawatan Kumbahan (STP) IWK di Taman Wawasan, Puchong susulan tanah runtuh baru-baru ini berikutan hujan lebat Sabtu lepas.

IWK dijangka tidak perlukan subsidi kerajaan mulai tahun hadapan – Nik Nazmi

Indah Water Konsortium (IWK) dijangka tidak lagi memerlukan subsidi daripada kerajaan bermula tahun hadapan berikutan usaha pengoptimuman konsesi itu bagi kos pengurusan dan pengoperasian

Popular