Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/conan-20240903/conan/wp-includes/functions.php on line 6114
Iliyas Jamil | Scoop

Iliyas Jamil

PSM assures Sri Putra Hall’s readiness for indoor hockey amidst Axiata Arena roof leak

Stadium Corporation assures MHC that Sri Putra Hall will be ready by the end of the month, with ongoing upgrades including air conditioning repairs, FIH-standard flooring installation for the indoor hockey team

Ongoing roof refurbishment works caused leaking at Axiata Arena – Stadium Corp CEO

Stadium Corp will work with the Public Works Department to ensure the incident doesn’t repeat before the Malaysia Open concludes on Sunday

Popular