Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the molongui-authorship domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/conan-20240903/conan/wp-includes/functions.php on line 6114
Boeing 737-9 MAX | Scoop

Boeing 737-9 MAX

Boeing’s troubles not over yet: FAA withholds MAX production expansion, orders rigorous inspections of grounded planes

The US Federal Aviation Administration has ordered a thorough inspection and maintenance process on each of the 171 grounded Boeing 737-9 MAX aircraft before they are allowed to return to service. 

[UPDATED] Alaska Airlines’ blown out door plug made in Malaysia, NTSB confirms

The door plug of the Boeing 737 Max 9 that blew out on an Alaska Airlines flight was made in Malaysia, the United States’ National Transportation Safety Board has confirmed.

FAA orders extended grounding of Boeing 737 MAX 9 as inspection continues

The Federal Aviation Administration (FAA) will keep Boeing 737-9 MAX grounded for the safety of American travellers until extensive inspection and maintenance are conducted and data from inspections is reviewed, the FAA said on its website Friday.

Popular